Plymouth NHS Trust - Central Records Library

01/01/0001

Plymouth NHS Trust

After the success of the initial installation (2400bays of static and mobile shelving) , MS Storage were approached again by Plymouth NHS Trust to add additional storage to a new extension on site. To achieve the required capacity a mezzanine floor was installed along with 762 bays of static and mobile.

Order details :

• On site survey
• 491 Bays of Mobile Shelving and 271 bays of static shelving
• Installation of 508m2 Mezzanine Floor and lift
• On site survey & CAD design layouts
• Full project management with an assigned site contact available
• 24 hours - Out of Hours Installation


The logistics of the installation were paramount to the smooth running of the whole hospital project. Working alongside a main contractor we were able to meet the client’s requirements in line with all DDA and Building regulations to the agreed costs and timeframes.